Limerick 1

Online · 100% power

Constellation Energy·Pottstown, PA·BWR·1,120 MWe

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Limerick 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
155
Current Run
days
#57 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
733
Record Run
days
#13 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (628 days for this 24-month cycle unit) with no trips to 0% power.
5
B2B Runs
#42 of 86
Mid Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
94.8%
Capacity Factor
#3 of 95
Top Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
19.35 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
6
Scrams
#35 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 18 years.
40.7
Operating Age
years
18 yrs remaining

Excellence Score, Records & Plant Facts

B2B CHAMPION
1,019 days without a trip  ·  5 Career Runs  · 1 since last trip
Champion since Jan 14, 2026

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Limerick Generating Station.

Limerick Generating Station has two units in Limerick Township, Montgomery County, Pennsylvania, beside the Schuylkill River, about 29 miles northwest of Center City Philadelphia. It has two natural draft cooling towers.

Read more

Construction began on June 19, 1974. Both units use General Electric BWR-4 boiling water reactors with Mark II containments. Unit 1 connected to the grid on April 13, 1985, and entered commercial operation on February 1, 1986. Unit 2 connected on September 1, 1989, and entered commercial operation on January 8, 1990.

21 miles northwest of Philadelphia, Pennsylvania Forum Lodging tips

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Limerick 1 has operated for about 40.7 years and averaged a 94.8% lifetime capacity factor, generating roughly 266.6 TWh of electricity. Its longest unbroken run reached 733 days.
Lifecycle & Tenure
Operating Age: 40.7 Yrs
Build Time: 11.6 Yrs
Lic. Remaining: 18 Yrs
Production & Power
Lifetime CF: 94.8%
Efficiency: 31.9%
Generated: 266.6 TWh
Reliability & Outages
Record Run: 733 Days
Refuelings: 14
Avg Startup: 5.4 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
Architect Engineer: BECH
Constructor: BECH
Ownership, operation and management history
DateChange FromTo
Oct 20, 2000 Merger PECO Energy Exelon
Feb 1, 2022 Spin-off Exelon Constellation Energy
CEG Constellation Energy Corporation NasdaqGS
$258.84 ▼ -4.35 (-1.65%)
Previous Close 263.19
Day's Range 257.78 – 263.90
52-Week Range 228.63 – 406.04
Volume 3,157,362
Delayed quote as of Oct 20, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Operational Excellence Score Subscribers

Limerick 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 2
NSS Supplier: GE 4
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 3515 MWt
Net Capacity: 1120 MWe
Gross Capacity: 1,194 MWe IAEA
Design Capacity: 1,055 MWe IAEA
Efficiency: 31.9%
Status: Operating
Lifetime Output: 352.8 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000352
License #: NPF-39
License Type: OL-FP
Const. Permit: 1974-06-19
Construction Start: 1974-06-19 IAEA
Operating Lic: 1985-08-08
First Criticality: 1984-12-22 IAEA
Grid Connection: 1985-04-13 IAEA
Commercial Op: 1986-02-01
License Renewed: 2014-10-20
License Exp: 2044-10-26

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: MAT — Middle Atlantic
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets