Well guys I started at the plant after a exhausting 8hr orientation Monday! I will say after 3 days in the plant this is by far the best job I have ever had!! The equipment location map is daunting but I see each day that I understand it a little more everytime I get home and look at it! The procedure were about 1.5" thick but after looking through them 80% of them are racking breakers in/out. I was told if it was the only thing I ever remember from the apo I'm working with it's to NEVER and I mean NEVER rack in/out a closed breaker! That's all can think about! A guy blew up a 4160v breaker racking it in due to an electrician leaving a lead wire hanging out the back. Said it melted his whole 40 cal arc gear. Anyhow enough yapping  I just wanted to say how much I like it thus far!

Laundry Man

Best of luck.  People have died racking breakers.  Was at Fermi when it happened.
LM

RadRooster

Glad to hear you are enjoying your work, it is a refreshing change. Be safe out there.