Quote from: dirac on Feb 03, 2012, 10:40 Leak was 80 gallons per day (.065 gpm) and a rate of change of 30 gallons per hour. Above the EPRI Limit for greater than Minor leakage and requires a Shutdown to less than 50% power within 60 minutes and be in Hotshutdown within the following 2 hours. 1. Reduce power to less than or equal to 50% power within one hour and be in Mode 3 within the next 2 hours (total of 3 hrs). 2. Monitor radiation monitor readings every 15 min and perform Appendix A. 3. Coordinate with Chemistry to identify leaking SG, quantify leakage and determine leakage rate-ofchange. 4. Initiate actions to minimize spread of contamination. 5. Evaluate need for additional resources in the following areas: Operations, Chemistry, Rad Protection, water processing, makeup water. AND the Operations Staff decided it was bad enough they entered their SG Tube Rupture EOP which isn't something the NRC takes miildly. Hardly a "minor" tube leak. See the point?