Quote from: hoho5973 on Nov 19, 2007, 03:25 What is the turnover like in the Ops Department? I bet they have room for one trainee: QuoteINVALID EMERGENCY DIESEL GENERATOR START "This telephone notification is being made under 10 CFR 50.73(a)(2)(iv)(A) in lieu of an LER submittal, pursuant to NUREG-1022, Section 3.2.6. "At 0512 on 09/27/07 the 'A' Diesel Generator (DG) was being restored to its normal lineup following a maintenance run. During restoration per Station Operating Procedure SOP-306, an under instruction Operations trainee inadvertently pressed the 'Emergency Start' pushbutton instead of verifying the 'Emergency Start' status light was clear as required by Step 2.4.b of the procedure. This resulted in a start of the 'A' DG in the emergency mode. Following an equipment walk down, the 'A' DG was then secured at 0518. "This inadvertent start of the 'A' DG was determined to be an invalid actuation since it was not the result of a valid signal nor an intentional manual actuation. This inadvertent start was complete, in that the DG started and ran, however; the bus was not required to be loaded and the output breaker did not close. Although inadvertently actuated, the 'A' DG started successfully and would have been able to function in the emergency mode if it had been required." The licensee notified the NRC Resident Inspector. http://www.nrc.gov/reading-rm/doc-collections/event-status/event/en.html#en43796 Anyway, while I don't have Summer experience, I can tell you they will be staffing up for replacements of their projected losses to retirement and new construction. Your timeline is not that challenging; almost any plant could meet that today.