Nuclear reactor material testing cut from days to hours with new US technology

Started by Marlin, Sep 15, 2026, 10:49

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

brookhaven national laboratory

Marlin


Core Content


Nuclear reactor material testing cut from days to hours with US setup

Engineers at Brookhaven National Laboratory deployed a consolidated X-ray testing station that reduces nuclear material analysis time from days to six hours. The apparatus combines four computed tomography modes onto a single stage, enabling simultaneous measurement of physical form, elemental composition, and atomic structure without damaging the sample. This capability accelerates the evaluation of advanced reactor components subjected to severe operational stress.

QuoteEngineers have launched an all-in-one X-ray testing station that cuts nuclear material analysis time from days to six hours.

Materials intended for next-generation nuclear reactors can now be evaluated in roughly six hours instead of multiple days, following the launch of a consolidated X-ray testing station. The system and its performance figures were detailed in the Journal of Synchrotron Radiation. Engineers deployed the setup at the X-ray Powder Diffraction beamline, part of the National Synchrotron Light Source II at Brookhaven National Laboratory.

Read the full article at Interesting Engineering:
https://interestingengineering.com/energy/nuclear-reactor-material-testing-time-cut