Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
The Analytical Laboratory housed the analytical, metallugical and chemical process laboratories and was divided into restricted and non-restricted areas. During Fernald's production era the facility was used to verify the uranium product quality. The laboratory used state of the art technology and various chemicals during the preparation and determination of the analytical result. More recently, the laboratory staff processed various samples associated with cleanup. The D&D of the Lab consists of asbestos abatement, building and equipment dismantlement, size reduction of building material and loading for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_DnD_14.jpg
Album name
Rennhack / Fernald (FEMP)
Date
Feb-29-2004
Filesize
50 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1428 times
Favorites
Add to Favorites