Help | Contact Us
NukeWorker Menu

FME 1 Zones on the Refuel Floor

Started by Melrose, Dec 04, 2007, 02:54

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Melrose

What is your experience regarding the location (at the handrails, the entire floor, 3' off the rails, whatever) of the FME 1 zone on the refuel floor?  What plant?
What type of buffer, width, postings, control, etc?


GLW

Take a look at this and pause it at 1:08, note the observer with at least three earrings in his left ear on the right side of the screen.

Does FME vary that much from plant to plant that multiple earrings are allowed in the exclusion zone around the SFP or cavity at some facilities?

I have not worked at one that did allow earrings, but I've been DnD'ing a long time and perhaps things have relaxed a bit,....



(sic)

been there, dun that,... the doormat to hell does not read "welcome", the doormat to hell reads "it's just business"


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?