Peach Bottom 2 began a routine refueling outage on October 12, 2026, matching its published schedule. The 1,265-MW boiling water reactor entered the maintenance period following an unscheduled-outage-free streak of 823 days.

Constellation Nuclear operates the plant, which commercialized in 1974, alongside 20 other U.S. nuclear units. The unit completed its prior operating cycle with a 99.7 percent capacity factor after running about 96 percent of its typical 732-day cycle. Across the broader U.S. fleet, 94 units showed an 81.3 percent capacity factor with 15 units currently in refueling.

DELTA, PA. Peach Bottom 2 came offline on Oct 12, 2026 for refueling. The unit started on the published date (Oct 12, 2026) with a planned 24-day outage running through Nov 5, 2026.

Going into the refueling, the unit had run for more than 2 years without an unscheduled outage. NukeWorker's start-date projection scores 100% accuracy for this unit.

Across the U.S. fleet of 94 commercial reactors, today's combined capacity factor is 81.3% (15 units currently refueling, 2 units in unscheduled outages), below the 81.8% baseline for this month over the past five years. At the same site, Peach Bottom 3 is running at full power. Millstone 3, Diablo Canyon 1, and Point Beach 1 also began refueling outages within the past week. With the unit offline for refueling, that takes about 1 million homes' worth of generation off the grid.

Peach Bottom 2 is a 1,265-MW General Electric BWR/4 operated by Constellation Nuclear (commercial operation since 1974). The utility operates 20 other U.S. nuclear units. Its operating license runs through 2053 (renewed in 2020). The unit ran at a 99.7% capacity factor in 2025, among the unit's strongest cycles.

Heading to Delta, PA for outage work? Current per-diem averages $125/night lodging plus $74/day meals (total $199/day), and Unemployment Benefits are $605 weekly. See open nuclear jobs in Pennsylvania on NukeWorker.

View Peach Bottom 2's ratings, history, projections, and current status on NukeWorker.

Want the full picture? Subscribe to the NukeWorker outage schedule for every current and upcoming U.S. nuclear outage.

Sources: NRC Daily Reactor Power Status reports, utility-published outage schedules, and NukeWorker's projections.